Matticks Building Services Ltd
Completed commercial construction project

Our Work

Projects

A selection of completed works across commercial, industrial and domestic sectors in Suffolk and East Anglia.

Industrial warehouse refurbishment interior completed
CIVILs

Bury ST Edmunds, Suffolk

Concrete pad installation for new waste compactor

Our team constructed the shuttering, reinforcement and subsequent concrete pour to create a new steel reinforced concrete base ready for our client to install their new waste compactor.

Services delivered

  • Steel reinforced concrete
  • Shuttering
  • Excavation
  • Armco barrier installation

Challenge

The existing ground from one side to the other was on an incline of around 300mm. The existing concrete had to be cut and broken out to construct new shuttering to ensure the new concrete pad was level with all the required falls needed for surface water drainage.

Delivery

Works were completed over a 2 week window ensuring minimum disruption to the busy loading bay next to the location of the new concrete pad.

Car park surfacing tarmac paving completed civils project
Civils

Bury St Edmunds, Suffolk

Civils works to aid replacement of 11kv transformer

Excavation of trenches around the existing transformer to uncover the high voltage cables attached. This was to ensure that when the new transformer was lifted in place the existing cables could be attached quickly minimising the downtime of the transformer. Removal of security fencing for better access during the changeover. Reinstatement of ground and fencing once the transformer had been replaced.

Services delivered

  • Excavation
  • Plant operation
  • On-site standby cover

Challenge

The other transformers in this area had to remain live as they fed other facilities in the surrounding areas. Permits to work around the Live cables had to be attained and adhered to and hand digging with insulated shovels was required in specific areas.

Delivery

Completed over 6 weeks in three phases. Our team were on standby on site to provide additional support over the period the transformer was replaced.

Office welfare facilities canteen staff room commercial refurbishment
Commercial

Suffolk

WELFARE REFURBISHMENT

Renovation of existing welfare facilities in an Engineers breakroom including canteen and kitchen area. Construction of new studwork walls and suspended ceilings.

Services delivered

  • Studwork and drylining
  • Kitchen installation
  • Tiling
  • Suspended ceilings

Challenge

Works had to be staggered and carried out to suit the clients needs and within their GAP maintenance period.

Delivery

Delivered over 3 weeks. All welfare facilities were handed over fully fitted and compliant with current regulations.

Fire door installation passive fire protection commercial building
Specialist

Suffolk

Custom Built Fire Door Replacements

Ongoing scheme to replace unserviceable and outdated wooden fire doors with new custom made-to-size metal fire doors for a client in a food manufacturing facility in Bury St Edmunds. All fire doors are 60 minute fire rated and can be made in any size, colour and glazing. Key card access can be provided via a motorised lock to work within your current access system if required.

Services delivered

  • Fire door survey and replacement
  • Intumescent sealing
  • Fire stopping

Challenge

Works had to be completed in a variety of different locations and areas including Electrical Switch rooms, Outdoor and Internal environments and Finished product areas.

Delivery

Currently we have replaced a total of 16 units with another 3 booked in for replacement this month.

Drainage groundworks excavation civils infrastructure commercial site
Civils

BURY ST EDMUNDS, Suffolk

Factory Drainage SOLutions

Ongoing scheme of works to upgrade the current drainage in various areas of the British Sugar factory in Bury St Edmunds. We have currently installed over 100m of ACO channel drainage in various locations across the factory as well as replacement manholes and underground drainage solutions. This particular project pictured required around 18m of Stainless Steel ACO drainage to be installed in a food production area to deal with surface water between cleans. We broke out the existing factory floor, installed the drainage and laid a new concrete screed so that all standing water ran away from equipment and into the new drainage channels. The screed was finished with a resin coating.

Services delivered

  • Surface water drainage
  • Food production protocols
  • Aco channel drainage

Challenge

Works had to be completed to a tight schedule in the shutdown period for this area, all food safety precautions had to be adhered to including adequate dust suppression.

Delivery

Completed on programme with time to spare, with the new drainage ready for the start of the new campaign.

Planned preventive maintenance commercial building facilities management
Planned preventive maintenance commercial building facilities management
INDUSTRial

Suffolk

BReaking Out of old concrete platform and replace with new concrete deck

This project required our team to break out an old concrete platform on the first floor of the factory which was around 100 years old and had deteriorated beyond repair. Due to the position of the deck and the load rating it could currently take, our team broke this out by hand and transferred the rubble via wheelbarrows to a rubble shoot around 15m away from the location. A herculean effort by all involved by anyone standards. Once this was demolished, a new Kingspan steel deck was installed by the clients steel contractors and we then installed the required reinforcement as required by the structural engineers design. After this we then mass poured a new concrete pad over the new deck using an inline concrete pump, we needed over 80m of pump line to reach the location!

Services delivered

  • Concrete demolition
  • Steel reinforced concrete
  • Planned maintenance project

Challenge

The location of the current pad which was embedded deep within the working perimeter of the min factory and surrounded by other machinery and equipment meant the only way to safely carry out these works was with man power and manual labour.

Delivery

Delivered on time over 2 phases within a 3 month period in the factory shutdown period.

Commercial construction project
Civils

BURY ST EdMUNDS, Suffolk

HGV KERB ROUNDABOUTS

Design, supply and installation of 3 HGV Kerb roundabouts within the Lorry Park at British Sugar Bury St Edmunds. These were to replace the existing plastic barriers previously used. Each roundabout was set together, steel rods were then installed into the back of each section with a resin anchor and the centre was infilled with concrete to ensure no movement when an HGV catches the roundabout.

Services delivered

  • HGV kerb installation
  • Tarmac surfacing
  • Concrete pour
  • Traffic management

Challenge

The nature of the location meant these HGV kerbs would be driven around by thousands of lorries over the course of the campaign so the design needed to be permanent and robust.

Delivery

Project had to be carried out during the shutdown period to a tight schedule over 2 weeks, which was delivered with time to spare.

Single storey rear extension completed exterior view
Single storey rear extension completed exterior view
Single storey rear extension completed exterior view
Domestic

Ipswich, Suffolk

single storey rear extension and kitchen Installation

Full single storey rear extension including groundworks, structural blockwork, bi-fold doors, rooflight, underfloor insulation, and full internal fit-out with herringbone flooring and kitchen installation.

Services delivered

  • Groundworks and foundations
  • Structural blockwork
  • Bi-fold doors and rooflight
  • Internal fit-out and flooring

Challenge

Works were carried out in a live residential property requiring careful sequencing to minimise disruption to the family throughout the build programme.

Delivery

Delivered on time and to budget, with the completed extension handed over fully finished and ready for occupation.

Security fencing and barriers installation project
Security fencing and barriers installation project
Security fencing and barriers installation project
Security fencing and barriers installation project
Security fencing and barriers installation project
Specialist

Various Locations, Suffolk

SEcurity Fencing and Barriers

We install a large array of security fencing solutions and barriers across commercial, industrial and agricultural sites throughout Suffolk and East Anglia. Our works include Armco vehicle impact barriers, V mesh and Palisade security fencing, Keyclamp modular handrail systems, and bespoke barrier configurations to suit site-specific requirements. All installations are carried out to manufacturer specifications with full risk assessments and method statements in place.

Services delivered

  • Keyclamp handrail
  • Armco barriers
  • V mesh security fencing
  • Palisade security fencing

Have a Project in Mind?

Talk to us — we'll survey, scope and price it properly.